-
Original Item: Only One Available. Now this is a lovely early war example of a unit painted US M1 fixed bale helmet! The decals painted on the sides are for the First United States Army, Ordnance. First Army is the oldest and longest-established field army of the United States Army. It served as a theater army, having seen service in both World War I and World War II, and supplied the US army with soldiers and equipment during the Korean War and the Vietnam war under some of the most famous and distinguished officers of the U.S. Army. It now serves as a mobilization, readiness and training command.
This is a very nice example of a genuine WWII Front-Seam Fixed Bale M1 Helmet made by McCord Radiator, with a lovely unpainted Westinghouse liner. The U.S. WWII M-1 helmet was only produced from 1941 to 1945. The first production batch resulted with over 323,510 M-1 helmets before the start of the American involvement in the war. This helmet is heat lot stamped 102B which indicates the approximate manufacture date of March 1942.
The Ordnance Department selected McCord Radiator and Manufacturing Company of Detroit Michigan to produce the steel M1 helmet bodies. These bodies were made from a single piece of Hadfield Manganese steel that was produced by the Carnegie-Illinois & Sharon Steel Corporations. Each completed raw M-1 helmet shell weighed 2.25 lbs each.
This M1 shell has correct early war fixed chinstrap loops, called "bales," and a stainless steel rim with a front seam. These rims were both rust resistant and had "non-magnetic qualities" that reduced the chance of error readings when placed around certain sensitive equipment (such as a compass). In November 1944 the specification was changed to have the rim seam in the rear of the helmet.
This helmet is a fine example and still retains all of its original WWII parts, and the shell has all original "corked" grain paint, showing only light use, with no evidence of a repaint. There is also the usual wear on the stainless steel rim. There are the expected stress cracks located on the front and rear of the helmet, a common sight to see with early manufactured M1 helmets. It has the correct early war OD green #3 Chin strap with a cast brass buckle. There is some oxidation present on the exterior and interior of the shell, please consult the shown photos. The rust isn’t too damaging, but it is still present.
The liner is correct high pressure WWII issue and stamped with a W for the Westinghouse Electric Co Manufactured in Pittsburgh, Pennsylvania this "high pressure" manufactured M-1 helmet liner is identified by an embossed "W" in the crown (which is still Westinghouse's logo to this day). Westinghouse was the largest M-1 helmet liner producer and had two production divisions; Micarta and Bryant Electric.
The Micarta Division produced about 13,000,000 M-1 helmet liners and the Bryant Electric Division about 10,000,000. Westinghouse Electric Company started M-1 helmet liner delivery in May 1942. Westinghouse did have a contract to produce airborne liners and converted an unknown amount to airborne configuration. Westinghouse discontinued production around August 17, 1945 when the war ended.
This true US WWII M-1 helmet liner can be identified through the frontal eyelet hole. Other correct WW2 features include cotton herringbone twill (HBT) cloth suspension. This HBT suspension is held tightly within the M-1 helmet liner by rivets and a series of triangular "A" washers. The three upper suspension bands are joined together with the correct string. This way the wearer could adjust the fit. The original leather chin strap is still present and solid. The leather sweatband is worn and but shows no signs of extensive damage.
An excellent, genuine early WWII issue helmet with two service member’s names on it, perfect for any collection! Ready to display!
First Army's entry into World War II began in October 1943 as Bradley returned to Washington, D.C. to receive his command and began to assemble a staff and headquarters to prepare for Operation Overlord, the codename assigned to the establishment of a large-scale lodgement on the European Continent following Operation Neptune, which was the invasion of Normandy. The headquarters were activated in January 1944 at Bristol, England.
Upon going ashore on 6 June 1944, D-Day, First Army came under General Bernard Montgomery's 21st Army Group (alongside the British Second Army) which commanded all American ground forces during the invasion. Three American divisions were landed by sea at the western end of the beaches, and two more were landed by air. On Utah Beach, the assault troops of VII Corps made good progress, but V Corps on Omaha Beach came nearest of all of the five landing areas to disaster. The two American airborne divisions that landed, the 82nd and 101st, were scattered all over the landscape, and caused considerable confusion among the German soldiers, as well as largely securing their objectives, albeit with units completely mixed up with each other. First Army captured much of the early gains of the Allied forces in Normandy. Once the beachheads were linked together, its troops struck west and isolated the Cotentin Peninsula, and then captured Cherbourg. When the American Mulberry harbour was wrecked by a storm, Cherbourg became even more vital.
After the capture of Cherbourg, First Army struck south. In Operation Cobra, its forces finally managed to break through the German lines. The newly established Third Army was then fed through the gap and raced across France.
With the arrival of more US troops in France, the Army then passed from the control of the 21st Army Group to the newly arrived 12th Army Group which commanded the First Army and the newly formed Third Army under Lieutenant General George S. Patton. General Bradley assumed command of the 12th Army Group and Lieutenant General Courtney Hodges was placed in command of the First Army. First Army followed Third Army, the American armies forming the southern part of the encirclement of Germans at the Falaise pocket.
After capturing Paris (the Wehrmachtbefehlshaber von Groß-Paris, Dietrich von Choltitz, capitulated 25 August, ignoring AH's Trümmerfeldbefehl), During the Battle of the Mons Pocket VII Corps took approximately 25,000 prisoners. First Army headed towards the south of the Netherlands. First army liberated most of Luxembourg in three days from 9–12 September 1944.
When the Germans attacked during the Battle of the Bulge, First Army found itself on the north side of the salient, and thus isolated from 12th Army Group, its commanding authority. It was, therefore, temporarily transferred, along with Ninth Army, back to 21st Army Group under Montgomery on 20 December. The salient was reduced by early February 1945. Following the Battle of the Bulge, the Rhineland Campaign began, and First Army was transferred back to 12th Army Group. In Operation Lumberjack, First Army closed up to the lower Rhine by 5 March, and the higher parts of the river five days later.
On 7 March, in a stroke of luck, Company A, 27th Armored Infantry Battalion, part of Combat Command B, 9th Armored Division, found the Ludendorff Bridge across the Rhine at Remagen still standing. It quickly captured the bridge and established a secure bridgehead. in the next 15 days, over 25,000 troops and their equipment crossed the river. By 4 April, an enormous pocket had been created by First Army and Ninth Army, which contained the German Army Group B under Field Marshal Model, the last significant combat force in the northwest of Germany. While some elements of First Army concentrated on reducing the Ruhr pocket, others headed further east, creating another pocket containing the German Eleventh Army. First Army reached the Elbe by 18 April. There the advance halted, as that was the agreed demarcation zone between the American and Soviet forces. First Army and Soviet forces met on 25 April.
In May 1945, advance elements of First Army headquarters had returned to New York City and were preparing to redeploy to the Pacific theater of the war to prepare for Operation Coronet, the planned second phase of Operation Downfall the proposed invasion of Honshū, the main island of Japan in the spring of 1946, but the Japanese surrender in August 1945 thanks to the atomic bombings of Hiroshima and Nagasaki terminated that effort.
- This product is available for international shipping.
- Eligible for all payments - Visa, Mastercard, Discover, AMEX, Paypal & Sezzle
We Buy Military Antiques
Our team expert buyers travels the world to pay fair prices for entire estate collections to singular items.
START SELLING TODAY
